Sun MicroSystems

ACCO’s Controls Division and Sunbelt Controls installed all of the controls in buildings 15, 16, 18, 19, 20, and Gateway 5 at the Sun MicroSystems Campus in Newark, CA.

This is an ALC system with over 1, 100 zones in a multi-building campus environment. Sunbelt worked closely with ACCO controls to coordinate the installation and commissioning of the control systems in these buildings.

Buildings 15 and 16 were built concurrently while buildings 18, 19, and 20 were concurrently built at a later date. The buildings included R & D, manufacturing support, and administrative offices. The HVAC systems included roof top units and chilled water systems, including chilled water monitoring for the labs and boiler systems as well as the zone work. All of the air handling units had built in chillers, so there was no campus chilled water piping required; however, there was an extensive condenser water system serving the computer room units in the labs.

The work was completed on time, on budget, and without incident.

Project Team

  • Owner - Sun MicroSystems
  • Mechanical Contractor - ACCO Engineered Systems
  • General Contractor - DPR, Inc.

 