Industrial / Manufacturing > Manufacturing
Toyota NAPLD

A design/build project for ACCO, Toyota NAPLD is a 1,000,000 sq. ft. parts logistic facility. The parts facility is positively pressurized using direct evaporative cooled units. The office portion is conditioned by Sanyo McQuay natural gas absorption units.

Project Data

  • 120 Tons of Chilled Water

Project Team

  • Owner Representative - Toyota
  • General Contractor - Snyder Langston
  • Mechanical Engineer - ACCO Engineered Systems

 
© Copyright 2001-2010 ACCO Engineered Systems, All Rights Reserved.