Industrial / Manufacturing > Pharmaceutical
Novartis

This 82,000 sq. ft. 2-story lab/office building has mechanical rooms on both floors on the ends of the building.

Eight 13,000 CFM air handlers and eight 13,000 CFM exhaust fans serve the space using Phoenix control valves for both the supply and exhaust systems. A separate carbon-filtration exhaust system is used for the Radio Isotope hood. There are approximately 40 hoods in this facility.

Hot water reheat coils provide exterior zone heating, served from three hot water boilers and a primary/ secondary heating hot water pumping system. Chilled water is provided from two 360-Ton centrifugal chillers with a primary only pumping system. There are remote cooling towers with sand filtration.

The building also has a greenhouse with separate custom air handlers and a separate 24-hour chilled water fan coil/ computer room unit system for the three computer rooms. There is a complete DDC control and lab integration system.

Project Data

  • 82,000 Sq. Ft.
  • 720 Tons with Air Handling

Project Team

  • Owner - Carr America
  • Architect - SGPA Architectural & Planning
  • General Contractor - DPR Construction
  • Mechanical Engineer - Earl Walls Associates

 
© Copyright 2001-2010 ACCO Engineered Systems, All Rights Reserved.